Timeline Feed

NVIDIA AI Data Center Feed

Chronological feed for NVIDIA using the best public timeline year available for each tracked facility.

How to Use This Feed

Feed items are ordered by the strongest public timeline year available for each tracked facility. Use the HTML page for scanning and the XML endpoint for readers, alerting, or downstream tooling.

Chronological Entries

SoftBank Tomakomai AI Data Center (Japan)
Tomakomai, Tomakomai, Hokkaido, Japan
2026
Under Construction300 MW

SoftBank is developing what is slated to be Japan’s largest AI data center in Tomakomai, Hokkaido. Announced in partnership with NVIDIA in November 2024, the facility will be the first in the world to receive NVIDIA DGX B200 systems (Blackw

Cassava AI Data Center (Morocco)
Casablanca, Northern Africa, Morocco
2026
Planned

Cassava Technologies and NVIDIA intend to expand their AI "factory" blueprint into Morocco, introducing high-density GPU clusters that will serve startups and public-sector programs across the Maghreb. Following the South African launch and

G42 “Stargate” UAE–US AI Campus (Abu Dhabi)
Abu Dhabi, Abu Dhabi, United Arab Emirates
2025
Under Construction5.0 GW

Abu Dhabi's G42 is developing a 10-square-mile AI campus dubbed “Stargate” that will host U.S. hyperscalers delivering frontier model training and sovereign cloud services across the Middle East. The first 200 megawatts of the 5 GW build-ou

MGX/Mistral AI Campus (Paris Region)
Paris, Île-de-France, France
2025
Announced1.4 GW

MGX, Bpifrance, Mistral AI, and NVIDIA announced a landmark joint venture at France's Choose France investment summit in 2025 to develop Europe's largest AI campus near Paris, with a planned capacity of 1.4 gigawatts (1,400 MW) — a facility

Naver & NVIDIA Morocco AI Data Center (Tamesna)
Tamesna, Northern Africa, Morocco
2025
Planned500 MW

South Korea's Naver is leading a consortium with NVIDIA, Nexus Core Systems, and Lloyd Capital to develop a 500 MW AI campus in Tamesna, Morocco, with TAQA Morocco contracted to supply fully renewable power. The project breaks ground in lat

JUPITER Exascale AI Data Center
Jülich, North Rhine-Westphalia, Germany
2025
Operational10 MW

JUPITER is Europe's first exascale-class supercomputer, housed in a modular liquid-cooled data center at Forschungszentrum Jülich. Built on Eviden BullSequana XH3000 racks populated with 24,000 NVIDIA GH200 Grace-Hopper Superchips, the syst

AIST ABCI-3 Supercomputer (Japan)
Tsukuba, Tsukuba, Japan
2025
Operational

Japan's National Institute of Advanced Industrial Science and Technology is rolling out the ABCI-3 platform at its Tsukuba campus to meet surging demand for generative AI. Built on HPE Cray XD systems with NVIDIA H200 GPUs and Quantum-2 Inf

Cassava AI Data Center (Egypt)
Cairo, Northern Africa, Egypt
2025
Planned

Cassava Technologies plans to establish its first North African AI data center in Egypt, leveraging NVIDIA supercomputing platforms to localize model training and inference capacity. The company is targeting Cairo as a launch point for addi

Cassava AI Data Center (Nigeria)
Lagos, Western Africa, Nigeria
2025
Planned

Cassava Technologies is extending its NVIDIA partnership to Lagos, equipping its Africa Data Centres campus with dedicated GPU clusters as part of a 12,000-accelerator rollout across the continent. The Nigerian facility is scheduled to come

Cassava AI Data Center (South Africa)
Johannesburg, Southern Africa, South Africa
2025
Under Construction

Cassava Technologies is converting one of its Africa Data Centres sites in South Africa into the continent's first NVIDIA-backed "AI factory." Phase one installs 3,000 high-density GPUs by mid-2025 within the operator's Johannesburg footpri

Microsoft Project Fairwater (Mount Pleasant, Wisconsin)
Mount Pleasant, Mount Pleasant, Wisconsin, United States
2024
Under Construction3.3 GW

Microsoft's "Project Fairwater" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus. Spanning over 1,500 acres on the site originally intended for the Foxconn venture, the campus is projected to r

Ooredoo/Syn‌tys AI Cloud Data Center (Qatar)
Doha, Doha, Qatar
2024
Operational30 MW

Syn‌tys, Ooredoo Qatar's data center arm, has rolled out the country's first sovereign AI cloud by deploying NVIDIA Hopper GP Us across its Tier III facilities in Doha. The launch equips government agencies, banks, healthcare providers, and

SDS “Open-Access” AI Supercomputer (Israel)
Petah Tikva, Petah Tikva, Israel
2024
Operational18 MW

Shonfeld Data Services has commissioned a ₪1 billion AI supercomputer in Petah Tikva equipped with 2,032 NVIDIA Blackwell B200 GPUs and a high-performance data fabric delivered in partnership with VAST Data. Marketed as Israel's first open-

Oman Data Park AI Infrastructure
Muscat, Muscat, Oman
2024
Operational10 MW

Oman Data Park has upgraded its Muscat cloud campuses with NVIDIA H200 accelerators, adding to an existing fleet of A100, A40, a nd A10 GPUs to furnish the Sultanate's first domestically managed high-end AI platform. The expansion supports

Oracle AI Cloud Infrastructure (US)
Hillsboro, Hillsboro, Oregon; Chicago, Illinois; Ashburn, Virginia, United States
2023
Operational800 MW

Oracle has transformed from a database company into one of the world's largest AI cloud infrastructure providers. In 2024–2025, Oracle committed $50 billion to data center expansion and became the third partner in the Stargate joint venture

NVIDIA “Israel-1” AI Supercomputer (Israel)
Israel (cloud access), Israel (undisclosed site), Israel
2023
Operational

NVIDIA is building the Israel-1 AI supercomputer to serve the country's fast-growing ecosystem of more than 800 AI startups. The system, deployed in phases beginning in late 2023, will scale beyond 2,000 NVIDIA H100 GPUs arranged in HGX clu

CoreWeave AI Data Centers (US)
Livingston, Livingston, NJ; Plano, TX; Manassas, VA; Chicago, IL, United States
2022
Operational500 MW

CoreWeave is the largest independent GPU cloud in the United States, built from the ground up for AI workloads. Founded as a cryptocurrency mining operation in 2017, the company pivoted to NVIDIA GPU compute and became the preferred cloud f

Discoverer+ AI Supercomputer Upgrade
Sofia, Sofia-Capital, Bulgaria
2021
Operational2 MW

Discoverer, Bulgaria's EuroHPC petascale system at Sofia Tech Park, was upgraded in 2025 with four NVIDIA DGX H200 systems tied into its BullSequana XH2000 cluster. The refresh adds 32 H100 GPUs, new high-speed storage, and enhanced UPS cap

NVIDIA Cambridge-1 Supercomputer
Harlow, England (East of England), United Kingdom
2021
Operational1 MW

Cambridge-1 is NVIDIA's national AI supercomputer for the United Kingdom, hosted within Kao Data's DGX-ready campus in Harlow. The system comprises 80 DGX A100 nodes linked with HDR InfiniBand, delivering more than 400 petaflops of AI perfo

NVIDIA AI Factory — Helsinki, Finland
Helsinki, Uusimaa, Finland
Under Construction40 MW

NVIDIA and CSC — Finland's IT Center for Science — announced a joint AI Factory in Helsinki as part of NVIDIA's European Sovereign AI initiative. The facility will be powered by 100% hydroelectric power sourced from Nordic renewable energy

NVIDIA Eos AI Supercomputer — Santa Clara
Santa Clara, California, United States
Operational35 MW

Eos is NVIDIA's internal AI supercomputer, located at the company's Santa Clara, California headquarters campus. When unveiled in 2023, it was the world's fastest AI supercomputer for commercial/industrial use, delivering 18.4 exaflops of A