Country
United States
AI data center dossier
Country
United States
Operator
Microsoft
Energy
Unknown
Known capacity
1.3 GW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
86%
1 citation linked
43.387, -87.876
Announcement and delivery timing still absent
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
As part of the multi-billion dollar "Stargate" AI supercomputer buildout, Microsoft and OpenAI are planning a 1.3 GW campus in Port Washington, Wisconsin. This facility is separate from the flagship Mount Pleasant site and is designed to support the massive compute requirements of future reasoning models. The site was selected for its access to stable power grids and potential for advanced cooling solutions. Port Washington is expected to serve as a critical northern node in the Stargate network, with infrastructure optimized for the power-dense requirements of next-generation AI hardware.
No dated milestones are published for this facility yet.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.