Tracked Facilities
5
20% operational
Operator Intelligence Report
5 tracked AI data centers with 16.3 GW of known capacity. 20% operational. Across 3 countries.
OpenAI operates 5 tracked AI data center facilities with a combined known capacity of 16.3 GW. 20% of facilities are currently operational, spread across 3 countries. The pipeline includes 2 under construction, 1 announced, 1 planned facilities.
Tracked Facilities
5
20% operational
Total Capacity
16.3 GW
Known IT load
Countries
3
Geographic spread
Dataset Updated
2026-04-04
Last refresh
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for OpenAI.
All 5 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of OpenAI's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 5 facilities associated with OpenAI, representing 16.3 GW of known IT capacity. 20% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.