Country
Indonesia
AI data center dossier
Country
Indonesia
Operator
EDGNEX by DAMAC
Energy
Unknown
Known capacity
144 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
86%
1 citation linked
-6.208, 106.845
Announcement and delivery timing still absent
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
EDGNEX’s Jakarta facility is a 144 MW hyperscale data center specifically designed for high-density AI racks and generative AI workloads. Representing a $2.3 billion investment, the campus features advanced liquid cooling and modular infrastructure to handle the extreme thermal loads of modern GPU clusters. Phase 1 is scheduled for completion in December 2026. Developed by Dubai-based DAMAC Digital, the facility positions Jakarta as a primary regional alternative for AI deployment, leveraging the city's robust connectivity and rapid digital transformation. The campus provides the high-performance compute capacity required for sovereign AI initiatives and global cloud services within the Indonesian market.
No dated milestones are published for this facility yet.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.