AI data center dossier

Digital Edge — CGK AI Mega Campus

Bekasi, West Java, Indonesia/datacenters/digital-edge-cgk-ai-mega-campus-indonesia.html

Country

Indonesia

Operator

Digital Edge

Energy

Unknown

Known capacity

500 MW

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

86%

Sources attachedVerified

1 citation linked

CoordinatesPublished

-6.235, 106.982

Timeline evidenceMissing

Announcement and delivery timing still absent

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

Digital Edge's CGK campus in Bekasi, Greater Jakarta, is a flagship 500 MW AI-ready infrastructure project, representing a $4.5 billion investment. The facility is designed to support the next generation of high-density AI workloads, featuring direct-to-chip liquid cooling and a target PUE of 1.25. Phase 1 is expected to come online in late 2026. The campus serves as a central node for global hyperscalers and regional tech firms requiring massive, scalable AI compute capacity. It leverages Indonesia’s growing digital economy and strategic position as a primary Southeast Asian tech hub, providing the infrastructure required for large-scale model training and high-throughput inference.

Analyst Flags

  • Timeline fields are missing, so sequence and delivery timing are still weak.
  • This entry relies on a thin source base and should be treated as an early public signal.

Timeline Signals

No dated milestones are published for this facility yet.

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Intelligence Reports

Structured analysis covering this facility's operator and market context.

Frequently asked questions

How big is Digital Edge — CGK AI Mega Campus?
Digital Edge — CGK AI Mega Campus has 500 MW of known IT capacity, located in Bekasi, West Java, Indonesia. It ranks #75 globally by capacity among 335 tracked facilities.
What is the status of Digital Edge — CGK AI Mega Campus?
Digital Edge — CGK AI Mega Campus is currently under construction. No dated milestones have been published yet.
Who operates Digital Edge — CGK AI Mega Campus?
Digital Edge — CGK AI Mega Campus is operated by Digital Edge. Structured intelligence reports are available for Digital Edge Operator Report and Indonesia Country Report.
What energy source does Digital Edge — CGK AI Mega Campus use?
Digital Edge — CGK AI Mega Campus is powered by unknown energy and is focused on mixed workloads. This is backed by 1 cited source.

Sources

  1. digitaledgedc.comdigitaledgedc.com