Announced Private Power Generation (Wind/Solar/Storage Hybrid)

Vantage Data Centers Texas Mega-Campus (Shackelford County)

Albany, Shackelford County, Texas, United States

Capacity
1400MW
Operator
Vantage Data Centers
AI Focus
Hyperscale Training
Year
2025

Vantage Data Centers announced a $25 billion investment in August 2025 to construct a 1.4 gigawatt (GW) hyperscale campus in Shackelford County, Texas. This rural location was selected for its vast land availability and potential for integrated renewable energy generation, with plans for a massive wind, solar, and battery storage hybrid plant on-site. The project represents one of the largest private infrastructure investments in Texas history, targeting the surging demand for AI training clusters that require multi-gigawatt power envelopes away from constrained traditional data center hubs.

Reference Metadata

Country
United States
Region
Shackelford County, Texas
City
Albany
Status
Announced
Timeline Year
2025
Location Precision
Region
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed

Vantage Nevada AI Data Center (NV1)

Henderson, United States

224 MW Under Construction
Same operator: Vantage Data Centers Same country: United States Same energy profile: Renewable