Operational Hydroelectric (Hydro-Québec)

Vantage Data Centers Quebec Expansion (Montreal & Quebec City)

Montreal, Quebec, Canada

Capacity
178MW
Operator
Vantage Data Centers
AI Focus
Hyperscale and AI Training
Year
2026

Vantage Data Centers has significantly expanded its Canadian footprint in early 2026, reaching a projected total capacity of 178 megawatts (MW) across its Quebec portfolio. This expansion is centered in Montreal and Quebec City, with the completion of the 30MW QC61 facility in Baie-D’Urfe (Montreal) in January 2026 and the ongoing development of the 86MW QC2 campus in Quebec City.

The Quebec sites are specifically positioned as high-density hubs for AI and cloud workloads, leveraging nearly 100% renewable hydroelectric power from Hydro-Québec. The facilities are designed to LEED Gold standards and provide the massive power envelopes required for modern GPU clusters and foundation model training. Total cumulative investment in the Quebec region has reached approximately $2.5 billion CAD, cementing Vantage’s position as a leading provider of sustainable digital infrastructure in Canada.

Reference Metadata

Country
Canada
Region
Quebec
City
Montreal
Status
Operational
Timeline Year
2026
Location Precision
Region
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed