Under Construction Solar (Utility PPA)

Vantage Nevada AI Data Center (NV1)

Henderson, Clark County, Nevada, United States

Capacity
224MW
Operator
Vantage Data Centers
AI Focus
Hyperscale Training and Inference
Year
2025

Vantage Data Centers is developing its first hyperscale campus in Nevada, known as NV1, located in Henderson (Clark County). The 224-megawatt (MW) campus spans multiple buildings and is designed to meet the high-density power requirements of AI and cloud service providers. Nevada’s favorable tax environment and growing regional fiber connectivity made Henderson an attractive location for Vantage’s Southwest expansion. The campus will be powered by regional solar energy through utility power purchase agreements and is designed for maximum water efficiency, a critical feature for the Nevada desert environment. Construction is ongoing, with the first phases expected to come online between 2025 and 2026.

Reference Metadata

Country
United States
Region
Clark County, Nevada
City
Henderson
Timeline Year
2025
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed