Under Construction Grid (We Energies) + 250MW Solar PPA

Microsoft Project Fairwater (Mount Pleasant, Wisconsin)

Mount Pleasant, Mount Pleasant, Wisconsin, United States

Capacity
3300MW
Operators
Microsoft · NVIDIA
AI Focus
Training (NVIDIA Blackwell GB200/GB300 Cluster)
Year
2024

Microsoft’s “Project Fairwater” in Mount Pleasant, Wisconsin, is designed to be the world’s most powerful AI data center campus. Spanning over 1,500 acres on the site originally intended for the Foxconn venture, the campus is projected to reach a peak electrical load of 3.3 gigawatts (GW) by late 2027—exceeding the average power consumption of the city of Los Angeles.

The facility is purpose-built to house hundreds of thousands of NVIDIA Blackwell (GB200 and GB300) GPUs, interconnected by a massive fiber optic network capable of circling the Earth 4.5 times. It features a state-of-the-art closed-loop liquid cooling system that eliminates operational water waste. Total investment in the Mount Pleasant area has surged to over $20 billion following the early 2026 approval of 15 additional data centers across two new campuses. Initial phases are set to go live in early 2026, serving as the flagship for training the largest AI models for OpenAI and Microsoft Copilot.

Reference Metadata

Country
United States
Region
Mount Pleasant, Wisconsin
City
Mount Pleasant
Timeline Year
2024
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed

Stargate AI Supercomputer

Lebanon, United States

5000 MW Under Construction
Same operator: Microsoft Same country: United States Same status: Under Construction

Microsoft Iowa AI Training Campus

West Des Moines, United States

800 MW Operational
Same operator: Microsoft Same country: United States Same energy profile: Renewable