Country
Israel
AI data center dossier
Country
Israel
Operator
Nebius & Mega Or
Energy
Unknown
Known capacity
80 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
86%
1 citation linked
31.747, 34.988
Announcement and delivery timing still absent
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
The Nebius & Mega Or Israel AI Hub is an 80 MW combined development across sites in Beit Shemesh and Masmiyya. Representing an $880 million investment, the facility is specifically designed for high-density GPU workloads, utilizing liquid-cooled infrastructure to support AI model training and inference. The Masmiyya site (22 MW) is scheduled for completion in Q3 2026, while the Beit Shemesh facility (58 MW) will phase in through early 2027. A significant portion of the capacity is allocated to the Israel Innovation Authority for national sovereign AI needs, reinforcing Israel's position as a global leader in high-tech infrastructure and AI research.
No dated milestones are published for this facility yet.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.