Under Construction

Microsoft — Markham AI Megaproject

Markham, Ontario, Canada

Capacity
112MW
Operator
Microsoft

Microsoft’s Markham Megaproject, located on Langstaff Road, is a central pillar of the company’s multi-billion dollar infrastructure expansion in Canada. With a planned capacity of 112 MW, the facility is specifically engineered to host high-density AI workloads, including Azure OpenAI and Microsoft Copilot services. The project is a major contributor to the Toronto area’s 596 MW construction pipeline, which is seeing a shift toward extreme power densities (125 kW+ per cabinet) to support next-generation GPU clusters. The Markham campus is designed to meet strict sustainability standards, leveraging Ontario’s low-carbon grid and utilizing advanced cooling technologies to handle the thermal demands of AI model training.

Reference Metadata

Country
Canada
Region
Ontario
City
Markham
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed

Stargate AI Supercomputer

Lebanon, United States

5000 MW Under Construction
Same operator: Microsoft Same status: Under Construction