Under Construction

Meta — Montgomery AI Expansion

Montgomery, Alabama, United States

Capacity
227MW
Operator
Meta

Meta is adding two massive buildings to its Montgomery, Alabama campus, bringing the total investment at the site to $1.5 billion. The expansion provides an additional 227 MW of clean-powered capacity, specifically optimized for high-density AI workloads. The facility is expected to be fully operational by the end of 2026. To support the increased power demand, Meta has secured significant renewable energy agreements with local utilities. The Montgomery site is a critical part of Meta’s Southeastern U.S. infrastructure, providing the specialized compute and cooling required for real-time AI inference and localized model training.

Reference Metadata

Country
United States
Region
Alabama
City
Montgomery
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed