Under Construction

EcoDataCenter — Borlänge AI Mega Campus

Borlänge, Dalarna, Sweden

Capacity
250MW
Operator
EcoDataCenter

EcoDataCenter 2, located in Borlänge, Sweden, is a flagship AI expansion project built on the site of a former paper mill. With an initial capacity of 250 MW and scalability up to 600 MW, it is one of the largest AI-ready campuses in the Nordics. Groundbreaking occurred in September 2025, with completion of the first phase scheduled for early 2027. The facility is purpose-built for high-density compute clusters and large-scale AI training. It utilizes 100% renewable energy and is designed to provide waste heat to 10,000 local apartments, integrating deeply with the region’s circular economy.

Reference Metadata

Country
Sweden
Region
Dalarna
City
Borlänge
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed