Operational Renewable (100% Carbon-Free)

Microsoft — Sweden Central AI Infrastructure

Gävle, Gävle / Sandviken / Staffanstorp, Sweden

Capacity
500MW
Operator
Microsoft
AI Focus
Training and Inference (20,000+ GPUs)
Year
2021

In June 2024, Microsoft announced a $3.2 billion investment to expand its Sweden Central data center region, specifically to accelerate AI transformation. The expansion includes the deployment of 20,000 advanced GPUs to support high-density AI workloads. This region, spanning Gävle, Sandviken, and Staffanstorp, is one of Microsoft’s most sustainable globally, operating on 100% carbon-free energy through a partnership with Vattenfall. The facilities use free-air cooling and were the first Microsoft data centers to use renewable backup power, aligning with Sweden’s position as a leader in green digital infrastructure.

Reference Metadata

Country
Sweden
Region
Gävle / Sandviken / Staffanstorp
City
Gävle
Status
Operational
Timeline Year
2021
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed

Microsoft Iowa AI Training Campus

West Des Moines, United States

800 MW Operational
Same operator: Microsoft Same status: Operational Same energy profile: Renewable