Operator Profile

Green Mountain AS

Track the global AI data center footprint controlled by Green Mountain AS. Green Mountain AS operates 1 tracked facilities with 50 MW of known capacity. 100% are currently operational.

Facilities

1

Known Capacity

50 MW

Countries

1

Statuses

1

Operational

1

Data Quality

100% cited
100% capacity known
100% geolocated
0% dated

Peer Ranking

Where Green Mountain AS stands among 203 tracked operators.

Compare side-by-side →
By facility count#98of 203
By known capacity#146of 203 · 50 MW
Share of top market
0% of the #1 operator's capacity

Operator Portfolio Brief

How this operator's infrastructure is positioned

A compact read on geographic concentration, live-versus-pipeline mix, and the largest disclosed site in this operator's portfolio.

Lead market
Norway
1 tracked facilities
Buildout mix
1 live / 0 pipeline
100% operational
Largest disclosed site
Green Mountain AI Data Center (Rjukan)
50 MW of known capacity
Primary energy source
Hydroelectric
1 of 1 facilities

Frequently asked questions

How many AI data centers does Green Mountain AS operate?
Green Mountain AS has 1 tracked facilities in the AI Data Center Index, with a combined known capacity of 50 MW across 1 countries.
Where are Green Mountain AS's AI data centers located?
Green Mountain AS's facilities span 1 countries. See the geographic breakdown and facility table on this page for the full location list.

Countries in Portfolio

Facilities