Country
Norway
AI data center dossier
Country
Norway
Operator
Green Mountain AS, Hewlett Packard Enterprise
Energy
Hydroelectric
Known capacity
50 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
86%
2 citations linked
59.879, 8.593
Announcement and delivery timing still absent
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Green Mountain operates a high-security AI and HPC campus inside a former NATO facility in Rjukan, Norway. The modular halls are built in 2 megawatt blocks that scale to roughly 50 megawatts of IT load, all powered by nearby hydroelectric stations. The site delivers Tier III certified colocation with diverse fiber connectivity, chilled-water and liquid-ready cooling that averages a ~1.1 PUE, and heat reuse projects such as routing server waste heat to a neighboring fish farm. Hewlett Packard Enterprise and other clients deploy GPU-dense supercomputers here to tap abundant renewable energy for large-scale AI training and scientific workloads.
No dated milestones are published for this facility yet.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.