Country
South Korea
AI data center dossier
Country
South Korea
Operator
Stock Farm Road, Inc., Jeollanam-do Provincial Government
Energy
Grid (planned mix with advanced cooling)
Known capacity
3 GW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
100%
1 citation linked
34.989, 126.471
1 dated field available
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Stock Farm Road, Inc. signed an early-2025 memorandum of understanding with Jeollanam-do authorities to build a 3 GW AI compute campus, one of the most ambitious proposals in the global pipeline. The multiyear project could require up to $35 billion of investment to outfit the South Jeolla site with cutting-edge liquid cooling, resilient grid interconnections, and modular buildings sized for massive GPU clusters. Backed by tech investors Brian Koo and Dr. Amin Badr-El-Din, the venture targets a late-2025 construction start and staged delivery through 2028 to create a "digital industrial revolution" hub for Korea's emerging AI economy.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.