AI data center dossier

Stock Farm Road 3 GW AI Data Center (South Korea)

Muan County (planned), Jeollanam-do (planned), South Korea/datacenters/stock-farm-road-ai-data-center-south-korea.html

Country

South Korea

Operator

Stock Farm Road, Inc., Jeollanam-do Provincial Government

Energy

Grid (planned mix with advanced cooling)

Known capacity

3 GW

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

100%

Sources attachedVerified

1 citation linked

CoordinatesPublished

34.989, 126.471

Timeline evidencePartial

1 dated field available

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

Stock Farm Road, Inc. signed an early-2025 memorandum of understanding with Jeollanam-do authorities to build a 3 GW AI compute campus, one of the most ambitious proposals in the global pipeline. The multiyear project could require up to $35 billion of investment to outfit the South Jeolla site with cutting-edge liquid cooling, resilient grid interconnections, and modular buildings sized for massive GPU clusters. Backed by tech investors Brian Koo and Dr. Amin Badr-El-Din, the venture targets a late-2025 construction start and staged delivery through 2028 to create a "digital industrial revolution" hub for Korea's emerging AI economy.

Analyst Flags

  • This entry relies on a thin source base and should be treated as an early public signal.

Timeline Signals

Earliest market signal2028

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Frequently asked questions

How big is Stock Farm Road 3 GW AI Data Center (South Korea)?
Stock Farm Road 3 GW AI Data Center (South Korea) has 3 GW of known IT capacity, located in Muan County (planned), Jeollanam-do (planned), South Korea. It ranks #9 globally by capacity among 335 tracked facilities.
What is the status of Stock Farm Road 3 GW AI Data Center (South Korea)?
Stock Farm Road 3 GW AI Data Center (South Korea) is currently announced. Known timeline milestones: Earliest market signal 2028.
Who operates Stock Farm Road 3 GW AI Data Center (South Korea)?
Stock Farm Road 3 GW AI Data Center (South Korea) is operated by Stock Farm Road, Inc. and Jeollanam-do Provincial Government. Structured intelligence reports are available for Stock Farm Road, Inc. Operator Report and Jeollanam-do Provincial Government Operator Report and South Korea Country Report.
What energy source does Stock Farm Road 3 GW AI Data Center (South Korea) use?
Stock Farm Road 3 GW AI Data Center (South Korea) is powered by grid (planned mix with advanced cooling) energy and is focused on training workloads. This is backed by 1 cited source.

Sources

  1. DatacenterDynamics (February 20, 2025)DatacenterDynamics (February 20, 2025)