AI data center dossier

ODATA — BG03 Bogotá AI Campus

Bogotá, Cundinamarca, Colombia/datacenters/odata-bg03-bogota-ai-campus-colombia.html

Country

Colombia

Operator

ODATA (Aligned Data Centers)

Energy

Unknown

Known capacity

120 MW

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

86%

Sources attachedVerified

1 citation linked

CoordinatesPublished

4.609, -74.081

Timeline evidenceMissing

Announcement and delivery timing still absent

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

ODATA's BG03, located in the Cundinamarca region near Bogotá, is set to be Colombia's largest data center with 120 MW of capacity. Part of a $1.3 billion regional expansion, the campus is specifically designed for high-density AI and hyperscale cloud workloads. Phase 1 is expected to be operational by the end of 2026. The facility positions Colombia as a primary alternative to Brazil for large-scale AI deployments in South America, leveraging the country's growing digital infrastructure and strategic alliance with Chile for shared supercomputing research.

Analyst Flags

  • Timeline fields are missing, so sequence and delivery timing are still weak.
  • This entry relies on a thin source base and should be treated as an early public signal.

Timeline Signals

No dated milestones are published for this facility yet.

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Intelligence Reports

Structured analysis covering this facility's operator and market context.

Frequently asked questions

How big is ODATA — BG03 Bogotá AI Campus?
ODATA — BG03 Bogotá AI Campus has 120 MW of known IT capacity, located in Bogotá, Cundinamarca, Colombia. It ranks #198 globally by capacity among 335 tracked facilities.
What is the status of ODATA — BG03 Bogotá AI Campus?
ODATA — BG03 Bogotá AI Campus is currently under construction. No dated milestones have been published yet.
Who operates ODATA — BG03 Bogotá AI Campus?
ODATA — BG03 Bogotá AI Campus is operated by ODATA (Aligned Data Centers). Structured intelligence reports are available for ODATA (Aligned Data Centers) Operator Report and Colombia Country Report.
What energy source does ODATA — BG03 Bogotá AI Campus use?
ODATA — BG03 Bogotá AI Campus is powered by unknown energy and is focused on hpc / supercomputing workloads. This is backed by 1 cited source.

Sources

  1. dataxconnect.comdataxconnect.com — odata-announces-massive-expansion-in-colombia