Under Construction

Microsoft — Aragón AI Campus

Zaragoza, Aragón, Spain

Capacity
300MW
Operator
Microsoft

Microsoft is building a 300 MW flagship AI data center campus in Zaragoza, Aragón, as part of its multi-billion euro investment in Spanish digital infrastructure. The facility is specifically engineered to host high-density AI workloads for Azure OpenAI and Microsoft Copilot services. Phase 1 is expected to deliver significant compute capacity by late 2026. The site was chosen for its access to stable power grids and the region’s commitment to 100% renewable energy matching. This project is a key component of Microsoft’s strategy to decentralize its European AI capacity while providing localized low-latency infrastructure for the Iberian market.

Reference Metadata

Country
Spain
Region
Aragón
City
Zaragoza
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed

Stargate AI Supercomputer

Lebanon, United States

5000 MW Under Construction
Same operator: Microsoft Same status: Under Construction