AI data center dossier

Meta — Altoona, Iowa AI Data Center Campus

Altoona, Iowa, United States/datacenters/meta-altoona-iowa-ai-data-center.html

Country

United States

Operator

Meta

Energy

Renewable

Known capacity

350 MW

Evidence profile

Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.

Readiness

100%

Sources attachedVerified

2 citations linked

CoordinatesPublished

41.652, -93.47

Timeline evidencePartial

1 dated field available

Machine-readable outputsPublished

HTML, JSON, and GeoJSON all available

Record Notes

Meta's Altoona, Iowa data center campus is one of the company's largest and most important AI training facilities in the United States. Located just east of Des Moines in Polk County, the campus has grown substantially since its opening in 2015 and now comprises multiple large data center buildings.

The Altoona campus was Meta's first data center in Iowa and benefits from MidAmerican Energy's wind-heavy grid — the utility has committed to 100% renewable electricity for Iowa, making it one of the most renewable-intensive grids in the US. Meta has signed long-term power purchase agreements with Iowa wind farms to power the facility, achieving carbon-free electricity at low cost.

Altoona hosts key infrastructure for Meta's AI research and production workloads, including Llama large language model training and the AI compute behind Meta's content recommendation, advertising, and safety systems. The Open Compute Project hardware designs pioneered at Meta's East Coast facilities have been implemented at scale at Altoona. Meta has invested over $1 billion in the Iowa campus and has been one of the state's largest private sector investments.

Analyst Flags

No obvious coverage gaps detected in the current structured record.

Timeline Signals

Earliest market signal2015

Nearby Facilities

Other tracked AI data centers within 300 km of this location.

Related Facilities

Intelligence Reports

Structured analysis covering this facility's operator and market context.

Frequently asked questions

How big is Meta — Altoona, Iowa AI Data Center Campus?
Meta — Altoona, Iowa AI Data Center Campus has 350 MW of known IT capacity, located in Altoona, Iowa, United States. It ranks #106 globally by capacity among 335 tracked facilities.
What is the status of Meta — Altoona, Iowa AI Data Center Campus?
Meta — Altoona, Iowa AI Data Center Campus is currently operational. Known timeline milestones: Earliest market signal 2015.
Who operates Meta — Altoona, Iowa AI Data Center Campus?
Meta — Altoona, Iowa AI Data Center Campus is operated by Meta. Structured intelligence reports are available for Meta Operator Report and United States Country Report.
What energy source does Meta — Altoona, Iowa AI Data Center Campus use?
Meta — Altoona, Iowa AI Data Center Campus is powered by renewable energy and is focused on training workloads. This is backed by 2 cited sources.

Sources

  1. about.fb.comabout.fb.com — news/2015
  2. datacenterknowledge.comdatacenterknowledge.com — facebook/meta-altoona-iowa-data-center