Country
Malaysia
AI data center dossier
Country
Malaysia
Operator
Digital Realty
Energy
Grid (Utility PPA)
Known capacity
14 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
100%
1 citation linked
2.923, 101.657
1 dated field available
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Digital Realty entered the Malaysian market in early 2026 through the acquisition and expansion of a data center facility in Cyberjaya. The campus currently operates an initial phase (TelcoHub 1) and includes adjacent land for an additional 14-megawatt (MW) hyperscale development. This site is strategically located in Malaysia's premier tech hub, Cyberjaya, and is designed to meet the growing demand for low-latency AI and cloud interconnection services as Malaysia positions itself as a regional data center hub for Southeast Asia.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.