ByteDance — Johor AI Data Center
Kulai, Johor, Malaysia
ByteDance is developing a massive 500 MW data center campus in Kulai, Johor, to support its global AI research and TikTok workloads outside China. This project, part of a multi-billion dollar regional investment, is specifically engineered for high-density AI clusters and large-scale model training. The facility leverages Johor’s proximity to subsea cable landings and abundant energy resources, benefiting from the “spillover” demand from Singapore. The campus features advanced liquid cooling and modular designs to optimize energy efficiency for generative AI processing. This project solidifies Johor’s emergence as a premier global destination for hyperscale AI infrastructure.
Reference Metadata
- Country
- Malaysia
- Region
- Johor
- City
- Kulai
- Status
- Under Construction
Browse This Facility Through The Index
Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.
Related Facilities
Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.
Google Cloud Malaysia AI Data Center (Johor Bahru)
Johor Bahru, Malaysia
Oracle — Malaysia Public Cloud Region
Kuala Lumpur, Malaysia
YTL & NVIDIA — Johor AI Cloud
Kulai, Malaysia
AWS — Malaysia Cloud Region (Cyberjaya)
Cyberjaya, Malaysia