Under Construction

AWS — Orrock Tech Campus (Virginia)

Spotsylvania, Virginia, United States

Capacity
770MW
Operator
Amazon Web Services

The Orrock Tech Campus in Spotsylvania County is a massive $35 billion long-term development by Amazon Web Services (AWS). Targeting 770 MW of operational capacity by 2027, the facility is reaching major construction milestones in 2026. The campus is purpose-built for AI infrastructure, utilizing AWS-designed Trainium and Inferentia chips and advanced liquid cooling. It represents a significant expansion of AWS’s Northern Virginia footprint into adjacent counties to secure the power and land required for gigawatt-scale AI supercomputing. The project includes extensive grid upgrades and partnerships with local utilities to ensure stable, high-capacity power delivery for hyperscale AI workloads.

Reference Metadata

Country
United States
Region
Virginia
City
Spotsylvania
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed