Operational Grid (National Electric Power Company)

Aqaba Digital Hub “Mega” Data Center (Jordan)

Aqaba, Jordan

Capacity
6MW
Operator
Aqaba Digital Hub
AI Focus
Colocation & AI-ready infrastructure
Year
2024

The Aqaba Digital Hub has opened Jordan’s first carrier-neutral Tier III facility with 6 MW of initial IT load, combining coloca tion space, an internet exchange, and high-density pods designed for AI and HPC deployments. Situated at the Red Sea port with d irect access to submarine cables, the site provides regional enterprises and hyperscalers with low-latency routes into the Middl e East and North Africa while supporting emerging use cases such as gaming, digital twins, and AI model hosting. Modular expansi on capability allows ADH to scale power and white space quickly as Jordan courts additional AI investments.

Reference Metadata

Country
Jordan
Region
Aqaba
City
Aqaba
Status
Operational
Timeline Year
2024
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed