Operational Grid (with renewable energy PPAs)

Google Gemini Cluster (Iowa/Nebraska)

Council Bluffs, Midwest (Iowa–Nebraska cluster), United States

Capacity
1000MW
Operator
Google
AI Focus
Training (Google Gemini model)
Year
2024

Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models. This “AI Hypercomputer” architecture integrates thousands of Google’s custom-designed TPU v5p accelerators, linked with high-speed optical circuit switching.

In 2024, Google accelerated this buildout with a $7 billion expansion in Iowa (focused on Council Bluffs and a new site in Cedar Rapids) and nearly $1 billion in Nebraska (spanning Papillion, Omaha, and Lincoln). To manage the extreme thermal demands of TPU v5p clusters, these facilities utilize “Project Deschutes,” Google’s fifth-generation direct-to-chip liquid cooling system. This technology allows for double the chip density per rack while reducing cooling energy consumption by 30%. The cluster leverages the region’s robust wind energy portfolio, with Google aiming for 24/7 carbon-free energy operations by 2030.

Reference Metadata

Country
United States
Region
Midwest (Iowa–Nebraska cluster)
City
Council Bluffs
Status
Operational
Timeline Year
2024
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed