Under Construction

Yondr — Toronto AI Data Center

Toronto, Ontario, Canada

Capacity
27MW
Operator
Yondr Group

Yondr’s Toronto data center is a 27 MW facility that broke ground in January 2025, with a scheduled “Ready for Service” (RFS) date in mid-2026. The project is notable for its AI-ready design, featuring a waterless closed-loop cooling system to minimize environmental impact. Located in the Greater Toronto Area, the facility provides the high-density power required for modern AI infrastructure while meeting the growing demand for colocation services from global tech firms and local startups. This project is part of Yondr’s global strategy to build hyperscale-ready infrastructure in key digital markets, leveraging Toronto’s position as a major North American tech hub.

Reference Metadata

Country
Canada
Region
Ontario
City
Toronto
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed