Meta–Oklo Advanced Nuclear AI Campus (Ohio)
Oak Harbor, Ohio, United States
On January 9, 2026, Meta announced a landmark agreement with Oklo Inc. (backed by Sam Altman) to develop an advanced nuclear technology campus in Ohio to provide up to 1.2 gigawatts (GW) of clean, baseload power starting as early as 2030. This partnership is a core component of Meta’s strategy to secure 6.6 GW of carbon-free energy by 2035 to support its global AI infrastructure buildout, specifically its “Titan Clusters” for training the next generation of foundation models.
Oklo’s advanced nuclear technology, utilizing small fast reactors, is designed to be more compact and flexible than traditional nuclear plants, offering a scalable energy solution that can be deployed closer to the data centers themselves. The Ohio campus is intended to function as a pilot for this integration, matching carbon-free, always-on energy with the massive, constant electricity demand of high-density AI clusters.
Reference Metadata
- Country
- United States
- Region
- Ohio
- City
- Oak Harbor
- Status
- Announced
- Timeline Year
- 2030
- Location Precision
- Region
Browse This Facility Through The Index
Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.
Related Facilities
Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.
Meta–TerraPower Natrium AI Campus (Wyoming)
Kemmerer, United States
Meta Hyperion AI Data Center (Louisiana)
Rayville, United States
Meta–Vistra Nuclear Uprate Agreement (OH/PA)
Perry, United States
Meta Project Prometheus (New Albany, Ohio)
New Albany, United States