Operator Intelligence Report

iliad Group AI Data Center Intelligence Report

4 tracked AI data centers with 916.2 MW of selected tracked capacity. 50% operational.

Secure checkout — $29

PDF report with full facility data, analytical breakdowns, source citations, and JSON/CSV export. Delivered within 24 hours.

Stripe opens next. We do not handle card details. The receipt and report handoff use the email above.

Executive Summary

iliad Group operates 4 tracked AI data center facilities with a combined selected tracked capacity of 916.2 MW. 50% of facilities are currently operational. The pipeline includes 2 planned facilities.

Tracked Facilities

4

50% operational

Tracked Capacity

916.2 MW

Selected tracked MW

Dataset Updated

2026-06-18

Last refresh

Report Quality

Source-backed analysis, not a generic PDF

The paid report is generated from the same index snapshot shown here, with the underlying facility list, source URLs, capacity fields, and machine-readable exports included for audit and reuse.

Source citations144 facilities with at least one cited source
Capacity coverage3/4facilities include selected MW capacity
Pipeline signal2non-operational facilities tracked in this slice
DeliverablesPDF + JSON/CSVreader brief plus structured export for internal analysis

Pipeline Analysis

Status Breakdown

Planned2
Operational2

Energy Profile

Renewable2
French low-carbon grid1
Low-carbon French grid (nuclear/hydro)1

Preview

Top Facilities by Capacity

Preview of the largest facilities. Full inventory included in report.

Operator Landscape

Top Operators

iliad Group4
Scaleway3
OpCore2
EDF1
InfraVia Capital Partners1

What's Included in This Report

Executive Summary

Key findings and market positioning for iliad Group.

Full Facility Inventory

All 4 facilities with capacity, status, energy, and coordinates.

Status & Energy Analysis

Pipeline breakdown, operational readiness, and power sourcing profile.

Geographic Breakdown

Country and regional concentration of iliad Group's AI infrastructure.

JSON + CSV Export

Machine-readable export with all structured fields for your own tools.

Source Citations

Every data point linked to original reporting for verification.

Frequently Asked Questions

How many AI data centers does iliad Group have?

The AI Data Center Index tracks 4 facilities associated with iliad Group, representing 916.2 MW of selected tracked capacity. 50% are currently operational.

What is included in the iliad Group intelligence report?

The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.

How is the report delivered?

Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.

Secure checkout — $29

PDF report with full facility data, analytical breakdowns, source citations, and JSON/CSV export. Delivered within 24 hours.

Stripe opens next. We do not handle card details. The receipt and report handoff use the email above.