Tracked Facilities
4
100% operational
Operator Intelligence Report
4 tracked AI data centers with 800 MW of selected tracked capacity. 100% operational. Across 4 countries.
Alibaba Cloud operates 4 tracked AI data center facilities with a combined selected tracked capacity of 800 MW. 100% of facilities are currently operational, spread across 4 countries.
Tracked Facilities
4
100% operational
Tracked Capacity
800 MW
Selected tracked MW
Countries
4
Geographic spread
Dataset Updated
2026-06-18
Last refresh
Report Quality
The paid report is generated from the same index snapshot shown here, with the underlying facility list, source URLs, capacity fields, and machine-readable exports included for audit and reuse.
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Key findings and market positioning for Alibaba Cloud.
All 4 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of Alibaba Cloud's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 4 facilities associated with Alibaba Cloud, representing 800 MW of selected tracked capacity. 100% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.