Tracked Facilities
7
86% operational
Country Intelligence Report
7 tracked AI data centers with 1.1 GW of selected tracked capacity. 86% operational.
China operates 7 tracked AI data center facilities with a combined selected tracked capacity of 1.1 GW. 86% of facilities are currently operational. The pipeline includes 1 under construction facilities.
Tracked Facilities
7
86% operational
Tracked Capacity
1.1 GW
Selected tracked MW
Dataset Updated
2026-06-18
Last refresh
Report Quality
The paid report is generated from the same index snapshot shown here, with the underlying facility list, source URLs, capacity fields, and machine-readable exports included for audit and reuse.
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for China.
All 7 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of China's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 7 facilities associated with China, representing 1.1 GW of selected tracked capacity. 86% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.