Operational Mixed

Tesla Dojo Supercomputer — Buffalo New York

Buffalo, New York, United States

Capacity
500MW
Operator
Tesla
AI Focus
Training (Autopilot, Full Self-Driving neural networks)
Year
2023

Tesla’s Dojo supercomputer at the Gigafactory New York (formerly SolarCity factory) in Buffalo is a purpose-built AI training system designed specifically for training Tesla’s Autopilot and Full Self-Driving (FSD) neural networks on video data from Tesla’s global fleet of 5 million+ vehicles. Dojo uses Tesla’s custom D1 chip — a 7nm training chip with 362 TFLOPS of FP32 performance — packaged into 25-chip training tiles and assembled into ExaPOD configurations. Tesla aims to achieve 100 exaFLOPS of training capacity with Dojo by the end of 2024. Each Tesla vehicle generates roughly 1 terabyte of video per hour; ingesting and training on this data at scale is among the most ambitious AI training infrastructure projects outside the major hyperscalers. Morgan Stanley valued Dojo as a potential $500 billion value creation opportunity for Tesla if commercialized as an AI cloud service.

Reference Metadata

Country
United States
Region
New York
City
Buffalo
Status
Operational
Timeline Year
2023
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed