Announced Grid (planned mix with advanced cooling)

Stock Farm Road 3 GW AI Data Center (South Korea)

Muan County (planned), Jeollanam-do (planned), South Korea

Capacity
3000MW
Operators
Stock Farm Road, Inc. · Jeollanam-do Provincial Government
AI Focus
Hyperscale AI training campus
Year
2028

Stock Farm Road, Inc. signed an early-2025 memorandum of understanding with Jeollanam-do authorities to build a 3 GW AI compute campus, one of the most ambitious proposals in the global pipeline. The multiyear project could require up to $35 billion of investment to outfit the South Jeolla site with cutting-edge liquid cooling, resilient grid interconnections, and modular buildings sized for massive GPU clusters. Backed by tech investors Brian Koo and Dr. Amin Badr-El-Din, the venture targets a late-2025 construction start and staged delivery through 2028 to create a “digital industrial revolution” hub for Korea’s emerging AI economy.

Reference Metadata

Country
South Korea
Region
Jeollanam-do (planned)
City
Muan County (planned)
Status
Announced
Timeline Year
2028
Location Precision
Region
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed