Planned

Polarise — Amberg AI Data Center

Amberg, Bavaria, Germany

Capacity
120MW
Operator
Polarise

Polarise is developing a 120 MW AI data center in Amberg (Unterallgäu), Bavaria, at the site of a former shortwave transmitter. The project is a cornerstone of the “European Sovereign AI” initiative, aiming to provide a locally-operated, GDPR-compliant alternative to US hyperscalers. The campus will be powered by a dedicated 120 MW green energy mix, including an existing 70 MWp solar park, 21 MW wind farm, and advanced battery storage systems in partnership with WV Energie AG. The facility will utilize modular “AI Pods” for rapid deployment, with full operations expected by mid-2027.

Reference Metadata

Country
Germany
Region
Bavaria
City
Amberg
Status
Planned
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed