Country
Finland
AI data center dossier
Country
Finland
Operator
Magnora & NEEG
Energy
Unknown
Known capacity
120 MW
Evidence profile
Readiness reflects whether the record has citations, narrative context, structured power data, coordinates, and at least one dated milestone.
Readiness
86%
1 citation linked
60.995, 24.464
Announcement and delivery timing still absent
HTML, JSON, and GeoJSON all available
Machine-readable outputs
Canonical record surfaces for audit, programmatic use, and direct citation.
Magnora ASA, in partnership with Northern Europe Energy Group (NEEG), is developing a 120 MW AI-ready data center in Hämeenlinna, Finland. Located in the MORE Industrial Park, the 150,000-square-meter site is strategically positioned between Helsinki and Tampere. The facility is designed for high-density AI training workloads and includes potential for waste-heat recovery to be integrated into the local district heating network. The project is expected to reach the Ready-to-Build (RTB) stage by late 2026, leveraging Finland's cool climate and stable energy grid for efficient AI infrastructure.
No dated milestones are published for this facility yet.
Other tracked AI data centers within 300 km of this location.
Structured analysis covering this facility's operator and market context.