Under Construction

Digital Edge — CGK AI Mega Campus

Bekasi, West Java, Indonesia

Capacity
500MW
Operator
Digital Edge

Digital Edge’s CGK campus in Bekasi, Greater Jakarta, is a flagship 500 MW AI-ready infrastructure project, representing a $4.5 billion investment. The facility is designed to support the next generation of high-density AI workloads, featuring direct-to-chip liquid cooling and a target PUE of 1.25. Phase 1 is expected to come online in late 2026. The campus serves as a central node for global hyperscalers and regional tech firms requiring massive, scalable AI compute capacity. It leverages Indonesia’s growing digital economy and strategic position as a primary Southeast Asian tech hub, providing the infrastructure required for large-scale model training and high-throughput inference.

Reference Metadata

Country
Indonesia
Region
West Java
City
Bekasi
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed