Planned

AWS — Aragón AI Mega Campus

Zaragoza, Aragón, Spain

Capacity
1000MW
Operator
Amazon Web Services

AWS announced a massive €33.7 billion investment in March 2026 to expand its infrastructure in Spain’s Aragón region. The plan includes the development of multiple high-capacity AI data center campuses across Zaragoza, Huesca, and Teruel. These facilities are designed to support the training and inference of large-scale generative AI models, leveraging Aragón’s abundant renewable energy resources (wind and solar). The expansion represents the largest technology investment in Spain’s history and positions the region as a primary digital gateway for Southern Europe. The campuses will utilize advanced liquid cooling and modular architectures to manage the extreme power densities of next-generation GPU clusters.

Reference Metadata

Country
Spain
Region
Aragón
City
Zaragoza
Status
Planned
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed