Tracked Facilities
29
48% operational
Operator Intelligence Report
29 tracked AI data centers with 11.9 GW of selected tracked capacity. 48% operational. Across 16 countries.
NVIDIA operates 29 tracked AI data center facilities with a combined selected tracked capacity of 11.9 GW. 48% of facilities are currently operational, spread across 16 countries. The pipeline includes 9 under construction, 6 planned facilities.
Tracked Facilities
29
48% operational
Tracked Capacity
11.9 GW
Selected tracked MW
Countries
16
Geographic spread
Dataset Updated
2026-06-18
Last refresh
Report Quality
The paid report is generated from the same index snapshot shown here, with the underlying facility list, source URLs, capacity fields, and machine-readable exports included for audit and reuse.
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for NVIDIA.
All 29 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of NVIDIA's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 29 facilities associated with NVIDIA, representing 11.9 GW of selected tracked capacity. 48% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.