Intelligence Report

Meta AI Data Center Intelligence Report

Operator analysis of 19 tracked AI data center facilities with 16.8 GW total known capacity.

Report date: 2026-03-31Source: AI Data Center Index19 facilities analyzed

Executive Summary

Meta has 19 AI data center facilities tracked in the index, representing 16.8 GW of known IT load capacity. 47% of facilities are currently operational. The dominant energy profile is Renewable, accounting for 74% of tracked facilities. Average facility capacity among those reporting is 884 MW.

Facilities

19

Total tracked in this segment

Known Capacity

16.8 GW

Total IT load

Countries

4

Geographic spread

Operational

47%

Currently live

Status Breakdown

Operational
9
Under Construction
5
Announced
4
Planned
1

Energy Profile

Renewable
14
Nuclear
5

Top Facilities by Capacity

#1
Meta Hyperion AI Data Center (Louisiana)United States
5 GW
#2
Meta–Vistra Nuclear Uprate Agreement (OH/PA)United States
2.1 GW
#3
Meta Project Prometheus (New Albany, Ohio)United States
1.5 GW
#4
Meta–Oklo Advanced Nuclear AI Campus (Ohio)United States
1.2 GW
#5
Meta — El Paso AI Mega CampusUnited States
1 GW

Full Report Includes

  • Complete facility list with capacity, status, and energy data
  • Operator concentration analysis and competitive positioning
  • Geographic distribution breakdown with regional detail
  • Timeline analysis: construction pipeline and delivery forecast
  • Machine-readable export (JSON + CSV)
  • Source citations for every data point
$29one-time
Request Full Report

PDF delivery within 24 hours. Includes structured data export.

Frequently Asked Questions

Key buyer questions about coverage, freshness, free preview access, and delivery format.

What does the Meta AI data center report cover?

The report packages the tracked operator footprint for Meta, including facility inventory, total capacity, status split, energy profile, top sites by power, source citations, and structured JSON/CSV export.

How current is the Meta report?

The preview updates from the live AI Data Center Index and shows a report date of 2026-03-31. The paid report is delivered from the same source-backed dataset, so buyers get the current snapshot at the time of request.

Can I browse Meta for free before purchasing?

Yes. The free index link on this page takes you to the public operator slice, where you can review the underlying facilities, filters, and source-backed entries before requesting the packaged report.

What format is the paid report delivered in?

Paid delivery includes a PDF brief plus structured JSON and CSV exports, which makes the report useful both for direct reading and for internal research workflows.

Browse Free

Every facility page, taxonomy view, and feed is free to read on the index.