Planned

ePLDT VITRO — General Trias AI Campus

General Trias, Cavite, Philippines

Capacity
100MW
Operator
ePLDT / VITRO Inc.

ePLDT’s VITRO General Trias is a 100 MW hyperscale AI campus in Cavite, Philippines, scheduled to begin construction in 2026. The $1 billion facility follows the successful launch of VITRO Sta. Rosa and is part of a national strategy to build a robust AI-ready infrastructure. The campus is optimized for GPU-intensive workloads, catering to both global hyperscalers and local enterprises. It benefits from proximity to Manila and significant investments in the National Fiber Backbone, ensuring high-speed connectivity for real-time AI inference.

Reference Metadata

Country
Philippines
Region
Cavite
City
General Trias
Status
Planned
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed