Operational Hydro & Geothermal (100% renewable)

atNorth ICE02 AI Data Center

Keflavík, Southern Peninsula, Iceland

Capacity
80MW
Operators
atNorth · Crusoe · Opera
AI Focus
AI Cloud & HPC Colocation
Year
2019

atNorth’s ICE02 campus near Keflavík, Iceland, offers more than 13,000 square meters of white space and scalable power beyond 80 megawatts for GPU-intensive tenants. The site pairs Iceland’s 100% renewable hydro and geothermal grid with direct-to-chip liquid cooling and free-air assist to support racks drawing 30–100 kW. Customers including Crusoe and Opera deploy NVIDIA DGX SuperPOD clusters and next-generation GPU pods here to train and serve large language models, benefitting from low-latency transatlantic fiber routes and a PUE close to 1.1.

Reference Metadata

Country
Iceland
Region
Southern Peninsula
City
Keflavík
Status
Operational
Timeline Year
2019
Location Precision
City
Machine-readable record
JSON GeoJSON

Browse This Facility Through The Index

Entry pages are the atomic records in the index. Use the JSON endpoint for programmatic access, then move through the taxonomy links to the broader operator, country, energy, and timeline views that contextualize this facility.

Related Facilities

Nearby slices in the index that share the same operator, geography, build phase, or AI profile. Use these to move laterally through the buildout instead of jumping back to the full directory.

Follow the buildout feed
7 MW Operational
Same status: Operational Same energy profile: Hydroelectric Same AI focus: HPC / Supercomputing