2026
Equinix SP7 São Paulo (Brazil)
Planned in this year
Brazil • São Paulo • 14 MW • Planned in this year • 2026
São Paulo
São Paulo
14 MW
planned
2024
AWS — Brazil AI Infrastructure (Expansion)
Operational by this year
Brazil • São Paulo • 300 MW • Operational by this year • 2024
São Paulo
São Paulo
300 MW
operational
Microsoft — São Paulo AI Infrastructure (Expansion)
Operational by this year
Brazil • São Paulo • 500 MW • Operational by this year • 2024
São Paulo
São Paulo
500 MW
operational