Tracked Facilities
1
100% operational
Operator Intelligence Report
1 tracked AI data centers with 7.1 MW of known capacity. 100% operational.
CSC – IT Center for Science operates 1 tracked AI data center facilities with a combined known capacity of 7.1 MW. 100% of facilities are currently operational.
Tracked Facilities
1
100% operational
Total Capacity
7.1 MW
Known IT load
Dataset Updated
2026-04-04
Last refresh
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for CSC – IT Center for Science.
All 1 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of CSC – IT Center for Science's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 1 facilities associated with CSC – IT Center for Science, representing 7.1 MW of known IT capacity. 100% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.