Tracked Facilities
8
38% operational
Country Intelligence Report
8 tracked AI data centers with 11.5 GW of known capacity. 38% operational.
United Arab Emirates operates 8 tracked AI data center facilities with a combined known capacity of 11.5 GW. 38% of facilities are currently operational. The pipeline includes 4 under construction, 1 announced facilities.
Tracked Facilities
8
38% operational
Total Capacity
11.5 GW
Known IT load
Dataset Updated
2026-04-04
Last refresh
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for United Arab Emirates.
All 8 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of United Arab Emirates's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 8 facilities associated with United Arab Emirates, representing 11.5 GW of known IT capacity. 38% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.