Tracked Facilities
2
50% operational
Country Intelligence Report
2 tracked AI data centers with 80 MW of known capacity. 50% operational.
Greece operates 2 tracked AI data center facilities with a combined known capacity of 80 MW. 50% of facilities are currently operational. The pipeline includes 1 under construction facilities.
Tracked Facilities
2
50% operational
Total Capacity
80 MW
Known IT load
Dataset Updated
2026-04-04
Last refresh
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Operator Landscape
Key findings and market positioning for Greece.
All 2 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of Greece's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 2 facilities associated with Greece, representing 80 MW of known IT capacity. 50% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.