Tracked Facilities
2
100% operational
Country Intelligence Report
2 tracked AI data centers with 180 MW of known capacity. 100% operational.
Austria operates 2 tracked AI data center facilities with a combined known capacity of 180 MW. 100% of facilities are currently operational.
Tracked Facilities
2
100% operational
Total Capacity
180 MW
Known IT load
Dataset Updated
2026-04-04
Last refresh
Pipeline Analysis
Preview
Preview of the largest facilities. Full inventory included in report.
Key findings and market positioning for Austria.
All 2 facilities with capacity, status, energy, and coordinates.
Pipeline breakdown, operational readiness, and power sourcing profile.
Country and regional concentration of Austria's AI infrastructure.
Machine-readable export with all structured fields for your own tools.
Every data point linked to original reporting for verification.
The AI Data Center Index tracks 2 facilities associated with Austria, representing 180 MW of known IT capacity. 100% are currently operational.
The report includes an executive summary, full facility inventory with capacity and coordinates, status and energy breakdowns, geographic distribution, source citations, and machine-readable JSON/CSV exports.
Reports are delivered as a PDF plus structured JSON/CSV data export, typically within 24 hours of purchase.